Product Name: | CZ Sigma Interchargeable Purlin Roll Forming Machine | Shaft Diametecrr: | ¢85mm, 40Cr |
---|---|---|---|
Steel Thickness: | 1.5-3.5mm | Station: | About 24 Stations |
Roller Material: | Gcr15 | Cutting System: | After Roll Forming |
Speed: | 0-15m/min | Main Power: | 30kw |
Hydraulic Power: | 22KW | Material: | GI And Carbon Steel |
Highlight: | Interchargeable Purlin Roll Forming Machine,CZ Sigma Roll Forming Machine,3.5mm Roll Forming Machine |
1.5-3.5mm CZ Sigma Interchargeable Purlin Roll Forming Machine with 3units Punching Stations
1. Main speficication:
Machine can produce C,Z,Sigma three profiles in one machine, change different profiles need to change some rollers, no need to change cutter. Through change rings on the shafts adjust size. Machine include 5T hydraulic decoiler, 7 rollers flatten system, pre-cutting system and two units punching system
2. The Chart of Process Flow
Uncoiler— Flatten—Servo Feeding& punching—Pre-cutting—Roll Forming—Auto stacker
3.Machine Detailed Parameters
1 | Machine structure | Wire-electrode structure |
2 | Total power |
Motor power-30kw Hydraulic power-22kw |
3 | Roller stations | About 24 stations with one station of rectify |
4 | Productivity | 0-15m/min |
5 | Drive system | By chain |
6 | Diameter of shaft | ¢85mm, 40Cr |
7
|
Voltage |
380V 50Hz 3phases (Customized) |
4.Specification of Components
No | Technical Specification & Remark | |
1 |
Main Roll Forming Machine
|
|
2 |
Machine structure:
|
|
3 |
Post cutting system
|
|
5.Machine pictures for reference
6.Warranty
1: Guaranteed against malfunctions due to manufacturing defects for 1 year after date of shipment. Repairs will be made free of charge.
2: Repairs will not be performed free of change even during the guarantee period in the follow circumstances
- Damage occurs due to a natural disaster
- Malfunction occurs due to user error
- Malfunction occurs due to modifications
- Malfunction occurs due to further movement or shipment after installation
3:Air ticket, transportation cost, hotel, meals and 100$ per day shall be for purchaser’s account if manufacturer’s engineer has to be send to purchaser’s factory to maintain the machine during the guarantee period.